|
4.0 VacDry vacuum kilns, Canadian install, July 2005
above: 50 Ton Cooling Tower, Canadian VacDry install
above left: VacDry Control Panel, New Zealand, Pre-Install
left: 4.0 VacDry vacuum kiln, New Zealand, Feb. 2006
below: an 8.0 installed inside a dirty, old track kiln.
An 8.0 installation in Hawaii.
This pic was taken from outside the building looking in, no wall.
|